1. The operator have to keep the machine pedestal level. If there are large exciting force, the operator should install the foundation bolt and tighten it.
2. If there are not only one motors, the adjacent motors have to adopt synchronization anisotropy moving method.
3. Before wiring, check the movement direction of each motor. If the direction is same, the operator should reverse one of wirings. Then parallel connecting into one single charging line.